Yellow sunburst graphic with radiating lines.

Fully Present
Fully Faithful

Making Room to Welcome and Love

At East Cobb UMC, welcome happens throughout the week: children learning in our preschool, neighbors finding support, and our church family gathering for worship, meals, and ministry.

Fully Present, Fully Faithful will help us make more room for that life together, creating spaces where more people can find belonging, grow in faith, and experience Christ’s love.

Architectural rendering of a modern church building with a cross on the roof, surrounded by green lawns and trees.
A collage showing a church choir performing, a family on a beach, volunteers sorting canned goods in a warehouse, a family outdoors, and children looking at a smartphone, centered by a logo.
A large group of children and adults posing for a photo in a room labeled “The Gathering Place.”

Why Fully Present,
Fully Faithful?


Fully Present

A renewed presence on Roswell Road will help our campus reflect the welcome and ministry within. That presence continues through us: noticing a new face at worship, caring for our neighbors, and building relationships that reach beyond Sunday mornings and beyond our walls.

Fully Faithful

Generations before us gave their time, care, and gifts to the church we know today. We honor their faithfulness by caring for what they entrusted to us and listening for God’s calling now. This campaign continues their work, preparing East Cobb UMC for the people and ministries still to come.

Fully Welcomed. Fully Loved.

The projects

A New Place of Welcome

Our next chapter begins with spaces that help people gather more freely, participate more comfortably, and find their place in the life of our church.

An outdoor covered walkway lined with cream-colored brick walls and several wooden doors.

Annex Demolition

Clearing the way for what comes next.

The annex has served East Cobb UMC for many years. Removing it will make room for the new Fellowship Hall and surrounding improvements, opening our campus toward Roswell Road and creating a more recognizable place of welcome.

A spacious, modern dining hall with rows of circular tables and floor-to-ceiling windows overlooking a green lawn.

A New Fellowship Hall and Kitchen

More room to gather. More room to serve.

A larger Fellowship Hall and updated kitchen will make room for church meals, celebrations, community gatherings, and growing ministries. It will also allow us to repurpose our current Fellowship Hall for other ministry needs, including youth ministry.

A public restroom with three white wall-mounted sinks, faucets, soap dispensers, and a paper towel dispenser, reflected in a large wall mirror.

ADA-Compliant Restrooms

Making welcome easier to experience.

New accessible restrooms near the sanctuary and Fellowship Hall will help members and guests with mobility needs participate more comfortably in worship, meals, and gatherings. These improvements bring greater ease and dignity to everyday church life.

A bright, modern lobby with high ceilings, glass entry doors, and a small group of people talking in the center.

New Church Offices and Preschool Expansion

Creating room for children, families, and ministry.

Dedicated church offices will better support our staff and the people they serve. Moving the offices will also open the current office area for preschool expansion, allowing us to welcome more children and families while strengthening security for our preschool community.

Help Shape the Next Chapter

Your prayer, participation, and gifts can help prepare a place of welcome for generations to come.

OUR PROJECT NEED

$800,000

$2.3 million already available
Approximately $3.1 million estimated project cost

Begin with Prayer.
Consider Your Gift.


As you consider your response, take time to pray, explore the vision, and talk with your household about the gift you intend to make over the three-year campaign period.

“Lord, what do you want to do through me?”

Commitment Sunday • November 22, 2026

Your commitment card shares that intention and helps the church plan responsibly for the work ahead. You may complete your commitment online or return a printed card during worship or through the church office.

Together, we will offer our commitments on Commitment Sunday, November 22, 2026.

A donation pledge card for the Fully Present campaign at East Cobb United Methodist Church, featuring fields for donor contact information, gift amounts, and signature.

Messages from our Capital Committee

This vision is rooted in love for the people who call East Cobb UMC home and those who have yet to find us.

Rev. Kristin Lee and Campaign Chair J.P. Michael share what this next chapter means to them, from caring for our congregation today to preparing a place of welcome for generations to come.

Rev. Kristin Lee

Senior Pastor

"As you know, we have been engaged in planning conversations about expanding and renovating our campus so that we can Fully Welcome and Fully Love even more in our community. "

J.P Michael

Committee Chair

"When I was asked to share my excitement about this project, I didn’t even know the building plan yet, or whether I would even like it. I was honestly just excited to help this church that I love."

RESOURCES

Take Time to Explore and Pray

These resources offer a closer look at the campaign and space to prayerfully consider your part in the life and future of East Cobb UMC.

Brochure cover for East Cobb United Methodist Church titled “Fully Present, Fully Faithful,” featuring photo collages of congregants and church activities.

Campaign Booklet

Explore the vision, learn about the projects, and find answers to common questions about Fully Present, Fully Faithful

A church pledge card for the Fully Present, Fully Faithful campaign, with fields for contact information, donation amounts, non-cash gifts, and signature.

Commitment Card

Use the card to share the gift you intend to make over the campaign period and help the church prepare for the work ahead.

East Cobb United Methodist Church 21-Day Devotional booklet cover featuring an open Bible on grass and a church icon.

Devotional Guide

Make time for Scripture, reflection, and prayer as you listen for God’s calling and consider your commitment to the future of East Cobb UMC.

YOUR QUESTIONS

FREQUENTLY
ASKED QUESTIONS

I’m concerned about a pastoral change. What if we start this project and one of our pastors is appointed to another church?

As United Methodists, we know that itinerancy is a reality for our church. The Bishop of our Conference is responsible for appointing all clergy; however, her decision is not made without consultation with both the pastor and the church.

Every year, the pastor and the Staff Parish Relations Committee submit a form requesting their pastor to either move or stay. These requests receive top priority in the appointment making process.

Additionally, Pastor Joe is an ordained Deacon and is responsible for managing his own appointment with approval from the Bishop. While we cannot guarantee a change will not occur, it is unlikely without the pastor and the SPRC making that request.

In order to expand our opportunities for ministry and mission, the following projects reflect our top priorities:

  • A larger Fellowship Hall to accommodate church and community gatherings
  • A larger, updated Kitchen to increase our capacity to feed people and allow the preschool to maintain its own kitchen
  • ADA bathrooms centrally located near both the new Fellowship Hall and the Sanctuary
  • Relocated office space for the church staff allowing the preschool to expand as well as further secure the preschool from outside church visitors

These items are part of our larger master plans, but will not be undertaken during this initial phase of the project:

  • A new classroom/meeting space to accommodate our growing discipleship program
  • A larger Gathering Place to accommodate our growing Sunday morning crowd and create a more seamless transition between the Narthex and the new Fellowship Hall
  • An enclosed ADA ramp to connect the children’s hallway to the Activities Building

Additionally, we plan some renovations to our current spaces including sheetrock and new flooring in the Sanctuary as well as movable partitions in the current Fellowship Hall to allow it to become dedicated Youth Ministry Space.

As mentioned above, we could begin the project in phases, completing each item as the funding is secured. Depending on the funding raised and the funding pledged, the church will have to make those informed decisions.

  • Based on the results of our feasibility study, we have determined a few phases for the project. The initial phase will complete the top priorities of the congregation including the demolition of the Annex, building a new Fellowship Hall with kitchen, new church offices, and ADA bathrooms.
  • A larger Gathering Place and an additional classroom space will need to be completed in a second phase. And the connecting ramp to the current Activities Building will require a third phase.
  • The Sanctuary renovations constitute another phase of the project, but as those are smaller renovations, the trustees will undertake this phase in their own timing.
  • As mentioned above, completing the project in phases is an option if we don’t reach our initial fundraising goal. It remains a top priority of the Building Team to not let another project go dormant.
  • All money raised in this campaign will go towards a building and cannot be used for any other purpose. It will remain in an investment account until it is used, allowing us to benefit from the interest earned in the interim.
  • Financing the balance will need to be considered and voted on by the church if a balance remains.

The architect has estimated $100,000 for furnishings and equipment for the new building. This is included in the overall construction budget, but it is just an estimate as we would be responsible for furnishing and equipping the building as we see fit.

This is something we are working with our architect to complete and receive input from our Trustees as they consider historical data and trends for regular upkeep and maintenance. We will publish this data once it is completed.

All church bills and obligations are current, allowing our ministry and mission to continue as planned. As of September 1, 2026 our income is below budget and running below our expenses. However, we anticipate giving will increase as the year progresses as folks complete their tithes at year-end. This follows our historical giving trends. We also celebrate the many new folks we have welcomed to the church and anticipate their giving to increase as they become more integrated into the life of the church.

We give thanks for a church contingency fund of $406,602 that allows for any overage in expenses if needed. Should we sustain a shortfall in the coming years similar to the shortfall in 2025, we would still be able to maintain our ministry and mission for over five years with our contingency. We do anticipate growth in participation, membership, and giving through this building project, which would increase our opportunities to restore our contingency fund.

Inflation is not a specific line item in the estimated price, but the overall estimated cost does include a buffer for unforeseen costs that includes inflation.

We give thanks for a church contingency fund of $406,602 that allows for any overage in expenses if needed. Should we sustain a shortfall in the coming years similar to the shortfall in 2025, we would still be able to maintain our ministry and mission for over five years with our contingency. We do anticipate growth in participation, membership, and giving through this building project, which would increase our opportunities to restore our contingency fund.

We currently have two accounts that receive interest income into our regular budget. The first account, which holds all our funds outside of designated building funds, will continue to generate income beyond the building project. We currently receive approximately $6,200 per quarter from this income.

The second account receives income from our Legacy Account, which currently holds all our building funds. The interest from this account would be nearly depleted once the money is spent on the building project. In 2025, this account received $38,189 and in 2026, it received $41,117. This income would need to be replaced to maintain our current ministry and mission budget.

The only interruptions we anticipate would be with work in the Sanctuary. This could be up to 4 Sundays while the Sanctuary renovations take place. We have multiple relocation options including the current Fellowship Hall, the Campground Arbor, or even a flashback to parking lot worship depending on the weather.

The architects were very clear in their design to ensure the new building fits cohesively into our current architecture, allowing for an updated look of the classic lines of our existing building. One of the biggest changes we asked for was to ensure our physical presence from Roswell Road clearly told passersby that we are a church (and not a nursing home as many have assumed).

The architects are well aware of the drainage issues and believe their design will address those concerns and sufficiently reroute the parking lot runoff to prevent future flooding.

The woodwork is one of the signature elements of our Sanctuary, and we will not be changing it. The change in flooring and added sheetrock to the cinderblock walls will actually improve our acoustics tremendously!

Yes! The building team is working with the architect to finalize the renderings and those will be shared widely once complete.

The rule of thumb for church parking is a ratio of 1 parking spot for every 2 seats in your worship space. We currently have 120 total parking spots, 80 in the main lot and 40 in the rear parking lot.

Experts recommend planning to fill just 80% of your parking, as that is when most people will look at the lot and assume it is full. Therefore, we can estimate a max capacity of 96 parking spaces filled and 192 attendees in worship or another gathering.

Should we reach that maximum capacity, we could explore multiple gathering/worship times or the possibility of adding additional parking along the rear of the current parking lot adjacent to the undeveloped land owned by the Campground.

Imagine the People Who Will Walk Through Our Doors.

Your prayer, participation, and gifts can help prepare a place where they are welcomed, loved, and supported in the years ahead.